ZR TRAFFIC & PLANNER

website

Hi, Welcome to

“ Providing comprehensive and variety of traffic services to meet the challenging needs of today transportation issue. “

About Us

Welcome to ZR Traffic and Planner, where innovation meets expertise in traffic engineering and transport planning. With a
dynamic vision forged over five years, we have emerged as a pioneering force in revolutionizing how we navigate and
conceptualize transportation systems.


Under the visionary leadership of our Managing Director, who boasts over two decades of unparalleled experience in traffic
engineering and transport planning, we have consistently set new standards of excellence. With a keen understanding of urban
mobility's intricate dynamics, our team is dedicated to crafting sustainable, efficient, and future-ready solutions.


At ZR Traffic and Planner, we believe in harnessing cutting-edge technology and strategic foresight to address the evolving
challenges of modern transportation. From optimizing traffic flow to enhancing public transit systems, we are committed to
shaping a world where mobility is seamless, safe, and environmentally conscious.


Driven by a passion for innovation and a commitment to client satisfaction, we take pride in our ability to deliver bespoke
solutions tailored to each project's unique needs. As we continue to push the boundaries of possibility, we invite you to join us
on our journey towards a more connected and accessible future.

Our Vision

To provide competent consultancy solution and be a partner of choice in the transportation consultancy industry to address the ever critical transportation problems and issues in Malaysia.

Our Objective

To be a Preferred Partner in providing transportation & traffic planning consultation. The firm’s thoroughness, integrity and enthusiasm assures client satisfaction.

Transport Master Plan

Traffic Impact Assessment

Traffic Management Plan

Traffic Signages Study

Parking Study

Traffic Risk Management

Our Services

We offer a variety of services tailored to client needs.

Transport Master Plan

Planning for the framework for on how the development will address it’s current and future transportation needs.

Traffic IMPACt assessment

Ensuring that the traffic effects by any proposed development are acceptable and will not affect the safety or functionality of the local road network.

TRAffic management plan

Preparation of a detail Traffic Management Plan to ensure the safety of all road users as well as to assure the smooth operation of the road network.

traffic signages study

Preparation of comprehensive signage to reduce misdirected travel. The plan will help to improve access, identification and connectivity to the destination.

parking study

Establish what constitutes a parking issue/problem and coordinate with other planning efforts and account for shifts in mobility patterns.

traffic risk management

Safety and Health in related to the affected Traffic Management at Work Zone (TMWZ) are to be included in managing traffic risk prior to commence on any Traffic Control Plan (TCP), Traffic Impact Assessment (TIA) and Traffic Management Plan (TMP) exposed to construction activities and live traffic, pedestrian and etc which are required under following Malaysian laws and regulation.

our services methodology

  • Measurement of traffic flow & data vehicle on site
  • Mountable Camera
  • O-D card Distribution for Cameron Highland Traffic Study assisted by the PDRM

Road Interview

  • (Origin-Destination Survey)
  • GoPro camera is used to capture on site data by driving the vehicle along the survey route, while the recorded information was retrieved manually in the office

Vechile Mounted Digital

  • Video - GoPro
  • The captured aerial photography images were used to determine the existing road conditions, characteristics, and probable composition. The captured images also provide a historical perspective of the ground conditions for future reference.

Aerial Photographic

  • mapping - mavic 2 pro
  • The existing traffic condition in the study area will be run using SIDRA INTERSECTION 9. Capacity and performance results presented in detailed output reports and graphical displays provided by SIDRA INTERSECTION helps in assessing the accuracy of the intersection and network models.
  • sidra intersection 9
  • The development of the building traffic model to established existing conditions and undertake future forecast.
  • inro software

our services methodology

MANAGEMENT

  • Diploma in Town & Regional Planning, UTM
  • Bachelor of Town & Regional Planning, UTM
  • Master in Highway Engineering, UiTM

Ts. Zarina Binti Rahmat

Managing Director

  • University of Strathclyde, Glasgow
  • Bachelor of Engineering (Civil) Hons
  • Highway Engineering & Road Safety Auditor

Ir Lim Kim Pore

Associates

MANAGEMENT

  • Diploma in Town & Regional Planning, UTM
  • Bachelor of Town & Regional Planning, UTM
  • Master in Highway Engineering, UiTM

Ts. Zarina Binti Rahmat

Managing Director

  • University of Strathclyde, Glasgow
  • Bachelor of Engineering (Civil) Hons
  • Highway Engineering & Road Safety Auditor

Ir Lim Kim Pore

Associates

PROFESSIONAL

  • University Putra Malaysia
  • Bachelor of Civil Engineering

Nur Illyana Binti Idris

  • University Technology Malaysia
  • Master of Engineering (Transportation)

Eric Ting Sie Ming

  • University Technology Mara
  • Bachelor of Town and Regional Planning

Nurul Syahira Binti Sarifudin

PROFESSIONAL

  • International Islamic University Malaysia
  • Bachelor of Urban & Regional Planning

Nur Aimmah Afni Binti Azmi

  • University of Malaya
  • Bachelor of Urban & Regional Planning

Siti Nor Adilah Mohd Hatta

MANAGEMENT TEAM MEMBER

  • University Technology Mara
  • Diploma in Civil Engineering

Noor Hazirah Binti Ahmad Tarmizi

  • University Tun Hussein Onn Malaysia
  • Diploma in Information Technology

Mohammad Noor Rahman Bin Rahmat

Team Experiences

The traffic study was conducted due to the needs of Cameron Highlands which require proposal of alternative routes to serve the traffic demand. Being the only main access road connecting Blue Valley to Ringlet, the traffic condition at FT59 is getting worse as there are many tourist attraction spots. The local people suffered severe traffic congestion. Therefore, due to this matter, the study will assist in finding the best solution to disperse heavy traffic by taking technical economic, social and environmental consideration.

  • KAJIAN KESESAKAN LALULINTAS CAMERON HIGHLANDS, PAHANG
  • 1
  • Project Brief :

Kementerian Kerajaan Raya Malaysia (KKR)

Team Experiences

Local plans in general are prepared based on Town and Country Planning Act 1976 (Act 172) which will be used by authorities and agencies at local and state level to control land use and physical developments within their administration area. For this study, our consultancy involve leading transportation sectoral to analyzed the existing condition and proposed recommendation based on the needs of Hilir Perak.

  • RANCANGAN TEMPATAN DAERAH HILIR PERAK 2035 (PENGGANTIAN)
  • 2
  • Project Brief :

IZM Consult & PLANMalaysia

Team Experiences

This Special Area Plan is subjected to Section 16B, Town and Country Planning Act 1976 (Act 172). The objective of this study is to detail out policies and strategies stipulated in Local Plan and Structure Plan. The needs of transportation sectoral is to make identification of issues related with accessibility and public transportation. Hence, comprehensive proposal will be made based on findings and analysis in order to enhance the study area.

  • RANCANGAN KAWASAN KHAS GENTING HIGHLANDS, SELANGOR
  • 3
  • Project Brief :

SS Planning Consult & PLANMalaysia

Team Experiences

ZR Traffic and Planner was commissioned to conduct a comprehensive Traffic Impact Assessment to determine the impact of demolishing, developing and upgrading the existing passenger terminal, cargo and RORO of Kuala Kedah which is located 12km from Alor Setar onto the proposed road network. From the findings, corrective measures to mitigate any adverse traffic impact will also be recommended.

  • PROJEK MEROBOH, MEMBINA DAN MENAIKTARAF TERMINAL PENUMPANG, KARGO DAN RORO KUALA KEDAH, KEDAH DARUL AMAN
  • 4
  • Project Brief :

Kementerian Pengangkutan Malaysia (MoF)

Team Experiences

Local plans in general are prepared based on Town and Country Planning Act 1976 (Act 172) which will be used by authorities and agencies at local and state level to control land use and physical developments within their administration area. For this study, our consultancy involve leading transportation sectoral to analyzed the existing condition and proposed recommendation based on the needs of Ampang Jaya

  • RANCANGAN TEMPATAN MAJLIS PERBANDARAN AMPANG JAYA 2035 (PENGGANTIAN)
  • 5
  • Project Brief :

Reka Rancang Majlis Perbandaran Ampang Jaya

Our Clients

0.0s

Our Gallery

Get in Touch

thank you for your nice attention

HQ

Email

zrtp@zrtrafficplanner.com

Phone

603 - 5880 4045

Fax

603 - 5888 9450